I have input a component as Altered, but it does not offer me the option of inputting the Existing item, how do I input the Existing?

Any items in which you wish to take credit for upgrades to an existing component are required to have the existing condition verified by an ECC rater.  You must go to the top level of the tree, and in the Misc Tab, check the box for ECC verification.


← Frequently Asked Questions

Comments are closed